Instant Call Back

INSTANT CALLBACK !

X

Please fill in your details below:

Mapsko Mount Ville
Status:Upcoming
Possession By:31st March, 2017
Estimated value by completion:40%
Expected to be sold out by:31-05-2015
Price1.04 Cr - 1.89 Cr
Description

Mount Ville by Mapsko Group welcomes you to a self-contained living space which is loaded with amenities. Ideally located in sector 79, Gurgaon, this project is in proximity to schools, hospitals and market areas. Come and choose from an array of home sizes which are built to suit the needs of families from various walks of life and size. Mapsko Group is celebrated in the Indian real estate sector for their futuristic projects and timely completion. 

Amenities

Swimming Pool

Kid's Pool

Sauna

Steam

Gym

Basketball Court

Tennis Court

Table Tennis

Children's play Area

Multi purpose Hall

PROPERTYSIZESPriceCarpet AreaBSP (Price per sq. Ft.)Floor Plan
3 BHKNot Specified1.04 Cr1117 Sq. Feet.6990View floor plan
3 Bhk + SQNot Specified1.27 Cr1361 Sq. Feet.6990View floor plan
4 BHk + SQNot Specified1.85 Cr1987 Sq. Feet.6990View floor plan
3BHK+TerraceNot Specified1.13 Cr1134 Sq. Feet.6990View floor plan
3BHK+Terrace+SQNot Specified1.37 Cr1372 Sq. Feet.6990View floor plan
4BHK+SQ+TerraceNot Specified1.89 Cr1897 Sq. Feet.6990View floor plan
3 BHKNot Specified1.06 Cr1057 Sq. Feet.6990View floor plan

Click here for

Download Brochure
Payment Schedule

Plan A : Installment Payment Plan (up to 20th Floors Tower)

At the time of Booking  6 Lac/ 7 Lac/ 10Lac
Within 45 days of Booking 20% of BSP (including Booking Amount) 
Within 90 days of Booking   10% of BSP 
On Start of Excavation 5% of BSP + 50% of EDC & IDC
On Completion of Foundation 5% of BSP + 50% of EDC & IDC
On Completion of ground floor slab 5% of BSP + 25%of PLC
On Completion of 3rd floor slab 5% of BSP + 25%of PLC
On Completion of 6th floor slab 5% of BSP + 25%of PLC
On Completion of 9th floor slab 5% of BSP + 25%of PLC
On Completion of 12th floor slab 5% of BSP
On Completion of 15th floor slab 5% of BSP
On Completion of 17th floor slab 5% of BSP
On Completion of structure 5% of BSP
On Completion of Brick Work 5% of BSP
On Start of Internal Plaster 5% of BSP
On Start of External Plaster 5% of BSP
At the time of offer of possession

5% of BSP +100% IFMS+100% of Power Backup Charges + 100% of Club membership + 100% of Gas pipe line charges. 

 

Plan B : Installment Payment Plan (More than 20th Floors Tower)

At the time of Booking  6 Lac/ 7 Lac/ 10Lac
Within 45 days of Booking 20% of BSP (including Booking Amount) 
Within 90 days of Booking   10% of BSP 
On Start of Excavation 5% of BSP + 50% of EDC & IDC
On Completion of Foundation 5% of BSP + 50% of EDC & IDC
On Completion of ground floor slab 5% of BSP + 25%of PLC
On Completion of 3rd floor slab 5% of BSP + 25%of PLC
On Completion of 6th floor slab 5% of BSP + 25%of PLC
On Completion of 9th floor slab 5% of BSP + 25%of PLC
On Completion of 10th floor slab 5% of BSP
On Completion of 15th floor slab 5% of BSP
On Completion of 20th floor slab 5% of BSP
On Completion of 23rd floor slab 5% of BSP
On Completion of structure 5% of BSP
On Completion of Brick Work 5% of BSP
On Start of Internal Plaster 5% of BSP
On Start of External Plaster 5% of BSP
At the time of offer of possession

5% of BSP +100% IFMS+100% of Power Backup Charges + 100% of Club membership + 100% of Gas pipe line charges. 

 

Down Payment Plan (10%Discount on BSP)

At the time of Booking  6 Lac/ 7 Lac/ 10Lac
Within 45 days of Booking 20% of BSP (including Booking Amount) 
Within 90 days of Booking   75% of BSP + 100% EDC & IDC + 100% of PLC  
At the time of offer of possession

5% of BSP +100% IFMS+100% of Power Backup Charges + 100% of Club membership + 100% of Gas pipe line charges. 

Possession Schedule

Possession Schedule

Bhumi Pujan ------
Completion of Ground Excavation ------

Completion of Cold Shell of building

------

Completion of warm shell of building  ------
Date of completion of construction March 2017
Proposed date of handover March 2017
Specifications

 

Specifications

Air Conditioning

Split AC's of Daikin or equivalent in all the bedrooms & Living Room.
Entrance Lobby Air Conditioned double height entrance lobby with 3 high speed elevators.

Living, Dining & Lobby/Passage

Floor Italian/Imported Marble 
Walls Plastic paint with pleasing shades and POP.
Bedrooms
Floor Premium quality laminated wooden flooring in all bedrooms.
Walls Plastic paint with pleasing shades and POP.
Fitting/Fixtures Wardrobes
Balconies
Floor Terrazzo/Ceramic Tiles
Walls Permanent Paint Finish
Kitchen
Walls ceramic Tiles Up to 2 feet above counter & plastic paint in balance area.
Floor AntiSkid ceramic tiles
Counter Granite
Fittings/Fixtures

Modular Kitchen with chimney & hob.

Gas Pipeline.

CP fittings of Grohe/Kohler or equivalent.

SS single bowl sink with drain board.

Toilets (Except servant's Toilet)
Walls

Ceramic tiles till 7'0" height.

Floor Antiskid ceramic tiles.
Counter Granite
Fittings/Fixtures

mirror.

CP fittings of Grohe/ Kohler or equivalent.

Premium Brand of WC & Wash basin.

Servant Room
Floor Terrazzo/Ceramic Tiles
Walls Acrylic Emulsion Paint.
Doors
Internal Seasoned Hardwood frames with moulded skin shutters
Entrance Door Teak veneered & Polished shutters
External doors & windows Branded UPVC
Electrical
Electrical

Modular switches of Legrand or equivalent.

Copper electrical wiring throughout in concealed conduit with provisions for light point, power point, TV & telephone sockets with protective MCB's.

Power back to be provided in each apartment minimum 5 KVA (mandatory)

Security System/Fire Fighting System
Security System/Fire Fighting System

3 tier security system, Gated community with CCTV in common areas. 

Fighting System

Facade
Facade Texture Finish
Floor Plan